Sept 2007 - The top track, windows and lime render

This video update shows the track being fabricated, lifted, as well as the lime render being applied.

Jan 2008 - Stairs, balcony and slate

This update shows the stairs being fabricated, the balcony lifted into place and the grain store slate.

Oct 2008 - Fantail, Cap, Stairs and Galvanizing.

This update shows the fantail and cap being fabricated, the third floor stairs and the frame being galvanized.