Search
Close this search box.

Windmill Restoration October 2007

The new balcony steelwork was assembled in 18 sections on the ground and subsequently craned into position. Once weather permits it will be primed and painted, so it should look as close as possible to the original.

We bought a set of 8’x1/4” pyramid rolls off ebay so Bob was keen to start rolling the stringers for the first flight of stairs. Due to the size of the stairs (first flight 21 steps) and the fact that this flight is both curved & tapered we decided to weld the stairs together ‘in-situ’. It took a lot of hands and G clamps to hold all the various bits ‘in-situ’, but overall the steps seemed to follow the wall fairly well.

Share the Post:

Related Posts