Search
Close this search box.

Windmill Restoration September 2007

During September the walls of the drying store, which had collapsed over the years, were re-built using stone and lime mortar. It was possible from the existing pockets in the walls to work out both the first floor and apex level, enabling the re-built walls match exactly the original profile.

A new box section balcony was fabricated and galvanized in sizes to match the original. The size and section of the balcony was determined by the sole surviving strut which had been left protruding from the tower since it had burnt down all those years ago.

Share the Post:

Related Posts